Waterproofing design and basement survey software

Most leaks start at the desk, not on site.

Installers build what your paperwork tells them. Site Steps walks your surveyors through every BS 8102 consideration, so the report, specification and quote agree, and the advice is the same whoever wrote it.

Built inside Trace Basement Systems. 1 month free trial.

Same inputs, same report, every time

Worried your paperwork won’t hold up to an audit?

The site works to what you issue. Now everyone reads it.

BS 8102, the PCA, the Building Safety Act and the CITB competence framework all lean on the documents your office sends out. Site Steps keeps them consistent, complete and traceable.

Grades, risk, water table, protection types and maintenance are set out as steps, so no consideration gets skipped on a busy day.

Auditors read your reports. Detailed, clearly presented reports with the right photos and diagrams come from a process, not from luck.

Read what the PCA said about Trace →

Specifications and as-built information can end up in a building’s permanent record. Keep it digital, accurate, consistent and traceable.

The CITB framework expects installers to work to clear drawings, specifications and exclusions. That starts with what the office issues.

Every consideration, in the same order
Design considerations
Phase 3 · Design
INTENDED USEHabitable space
GRADE OF USEGrade 3
WATER TABLE RISKHigh, permanent
PROTECTION TYPEType C cavity drain
MAINTENANCE REGIMENext step
Combined protection check
High water table and Grade 3 use. Site Steps prompts the surveyor to consider combined protection before moving on.
Reports an auditor can follow
TRACESurvey report · Rev A
Victoria Road basement
Waterproofing design to BS 8102:2022
2.4 Findings and moisture readings
Before it’s issued
Photos placed against each finding
Design drawings and diagrams attached
Exclusions and works by others stated
Report, spec and quote agree
Every change logged, with the reason
Issued versions
Rev C current
Rev C · Sump relocated to plant roomChanged by J. Hockey · 11 Nov · Reason: client layout change
Rev B · Wall membrane extended to stair coreChanged by site surveyor · 4 Nov · Reason: survey of lower stair
Rev A · First issueIssued by J. Hockey · 28 Oct
Spec, quote and handover packOne source
What the installer receives
Issue to site
Victoria Road · Rev C
Specification, extent and exclusionsReady
Design drawings and detailsReady
Works by othersReady
Quote lines matching the scopeReady
Issue to site

Still copying last month’s report and hoping nothing’s missed?

Capture what you know once. Every report after that starts better.

Each step in Site Steps is a decision you already make on site. Each option carries your approved wording, photos, quote lines and exclusions, so the right content lands in the report every time.

Choose what applies to this job. Your approved report text, images and exclusions are added for you, ready to tweak.

Quote lines come from one controlled price list. Change a choice and the report and the quote update together.

Drag stages into the order you work. Improve a step for one job, or save it so every future report starts better.

Send a finished report and quote in your own templates and branding. No reformatting late at night.

See it with your own documents →
Your approved wording, added for you
Client scope
Step 6 of 96
New-build basement
Basement conversion
Cellar refurbishment
Below-ground extension
Lift pit
Report wording
Waterproofing proposal

A cavity drainage system is proposed to the new-build basement, to BS 8102 Type C. Membrane linings to walls and floors link to perimeter drainage channels and a twin sump pump.

+ 3 quote lines+ 2 exclusions+ 1 photo
Report and quote update together
Cost
Updated just now
Cavity drain membrane to walls42 m²£2,940
Cavity drain membrane to floor37 m²£1,850
Perimeter drainage channel28 m£1,960
Twin sump pump chamber with alarm1 no.£2,450
Labour, commissioning and disposal£1,300
Total quote£10,500
Work by others
Main contractor to form the drainage channel recesses.
Your process, step by step, in your order
Report contents
96 stages · 8 phases
JOB TYPEPhase 1 · Enquiry
SITE EVALUATIONPhase 1 · Enquiry
CLIENT SCOPEPhase 2 · Brief
WALL MEMBRANEPhase 4 · Linings
DRAINAGE CHANNELPhase 5 · Drainage
SUMP PUMP SYSTEMPhase 5 · Drainage
Moving
Word and Excel, in your own house style
TRACESurvey report · Rev A
Victoria Road basement
Waterproofing design to BS 8102:2022
3.2 Waterproofing proposal
.docx
Quotation.xlsx
ITEMQTYTOTAL
Wall membrane42 m²£2,940
Floor membrane37 m²£1,850
Drainage channel28 m£1,960
Sump chamber1£2,450
Labour & disposal£1,300
Total£10,500
Export report pack

Wondering where AI fits in all this?

Your process makes the decisions. AI only tidies the paperwork.

AI writing tools pick a likely next word, so the same question can give a different answer. For a report with your name on it, that’s a risk. Site Steps keeps design, scope and prices inside your own approved process.

Your content stays yours

All the wording, prices and know-how you put in remain your intellectual property. GDPR compliant, with no external data dependencies.

Same inputs, same report

One controlled price list and your approved wording mean every surveyor gives the same advice, with a record of what was issued and when.

Formatting the client packAI helps
Tidying layout and presentationAI helps
Design decisions, scope and pricesYour process

AI inside guardrails

Use your preferred AI tool to polish the final pack. The judgement stays with the people who can warrant it.

Written to stand up toBS 8102:2022PCA auditsBuilding Safety Act golden threadCITB Structural Waterproofing Competence Framework

All your documentation, done in one workflow

Get your specification templates, method statements and quoting system set up for free

Person Image Hero SectionPerson Image Hero SectionPerson Image Hero Section
Limited offer: 1 month free trial
We'll get you set up on Site Steps for free

// Testimonials

Trusted by Contractors Across the Industry

"We took the information from our existing templates and written guidance, added it to Site Steps, and can now produce bespoke guidance by selecting the relevant information for each (waterproofing) consideration. Site Steps compiles it all, into each document. This has improved consistency across all our documentation, while taking away the strain associated with manual document production. The ability to easily update your guidance for use across the team is also a gamechanger."

James Hockey - Trace Basement Systems

Avatar 04

Simon Parkinson

MC Roofing
Icon 03
Icon 03
Shape 08

See how it works with a 30 min demo

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Site Steps construction software insights

We're working hard to improve how the construction industry uses software.

Ready to Use Construction Project Software That Actually Fits How You Work?

Scope projects faster, produce better documentation, and generate professional quotes — all from one connected system.

We’re inviting a small group of forward-thinking companies to help shape Site Steps around the way they already work. In return, you’ll get a tailored platform built to fit your processes — not force you to change them.